New Features 4/14/2024

  • ControlBoard
  • Apr 14, 2024
  • 1 min read
ree

  • The scheduling toolbar, available from the Job, Crew, and Resource schedule screens, now features a Resolve Conflicts button (the calendar with the X) which resolves resource conflicts in bulk automatically.

  • Scheduled Job Count has been added to the metrics. It displays the number of unique jobs that have at least one item scheduled in the given time range.

  • A new Job Cost Summary report, available from the Accounting menu, sums the job costs by job and total costs, by job cost, across all jobs.

  • The Jobs Board report now includes a link to a map with the job's location.

  • In the Allocation editor, allocation ranges can now be set by using either a date, as before, or the number of working days in the shift, which is often more convenient.

  • A new Accounting/Management user level has been introduced, at half the price of a full user license. Users at this level can edit jobs and time entries, but not the schedule.

  • It is now possible to define the structure of your crew types, through the Resource Type editor, and incorporate this structure into your planning and forecasting metrics.

  • Texting, formerly confined to the United States and Canada, is now supported for most countries in the Western Hemisphere.